With over more than 30 years of Industry experience, our founder and his team have delivered an incredible amount of projects. Here below is a florilegia of the main achievements that they were personally responsible for. 

Most Significant
 PROJECTS 

01

LIVISTA ENERGY

02

ARCTIC LNG 2 

03

YAMAL LNG

LIVISTA ENERGY

Jean-Marc ICHBIA - Chief Executive Officer and Board member

Peter BRIDGELAND - Project Director

Svetlana UZLOVA - Progress Monitoring Manager 

Jennifer CUNNINGHAM - Chief Human Relations Officer

Obianuju Okoye - Contracts Manager

LITHIUM REFINERIES [France and Germany]

Project size 

  • 1 Bn€ for each plant

  • 80 000 tpa of battery grade Lithium production with 2 trains

  • 100% renewable  / low CO2 emission energy 

  • H2 ready plant with GHG reduction plan defined from DFS/FEED stage

Achievements

  • Building of Group and the company internal structures.

  • All HR and organisation procedures, including mobilisation plans and Project monitoring procedures.

  • Optimum economic Execution Plan elaboration and negotiation on all industrial contracts (PFS / DFS / FEED).

  • Plant design improvement for 30% production increase with only 10% CAPEX increase.

  • Plant availability from 80 to over 95%.

  • Site selection coordination / tenders and subsidies programs in both countries. 

  • Preparation of subsidy dossiers: French C3IV tax credit, EU Innovation Fund. 

  • Elaboration of business and financial plan. 

ARCTIC LNG 2

3 LNG PLANTS [Russia - north of the Polar Circle]

​Project size 

  • 22 Bn€ for 3 plants of 680 000 t each including 150 000 t of Plant Modules

  • 19.8 Mtpa of LNG

  • Over 70 000 workers on more than 10 sites

  • 11.5 Bn€ Project Finance

​

Achievements

  • Creation of the Project from scratch in Novatek, running concept, Pre FEED, FEED and EPC.

  • All organisation and project monitoring procedures defined and implemented, contract templates, mob plans etc. 

  • Optimisation of the Execution Plans and negotiation on all contracts including 2 multi Bn€ EPC contracts.

  • The Project maintained on cost and on time despite 2 years of Covid until 95% of progress for Plant 1 in Feb 2022. 

  • At that time, the project was running to reach one the lowest cost per ton of LNG in the world.

  • A claim of over 270 M€ resolved for less then 10 M€.

Jean-Marc ICHBIA - Project Director and Board member

Peter BRIDGELAND - Engineering Manager

Ashish CHOPRA - Project Construction Manager - Module & Interface

Svetlana UZLOVA - Planning & Progress Expert

Jean-Marc ICHBIA - LNG Department Director, Project Sponsor and Board member

Peter BRIDGELAND - Engineering Manager

Yamal LNG

3 LNG PLANTS [Russia - north of the Polar Circle]

Project size 

  • 29 Bn€ for 3 modular plants of 485 000 t each 

  • 16.5 Mtpa of LNG (largely exceeding this performance today)

  • Over 60 000 workers on more than 10 sites

  • 18.5 Bn€ Project Finance

Achievements​​

  • We created and defended the Project concept and created a team with Novatek running concept, PreFEED, FEED and EPC. 

  • We optimised the Execution Plan and negotiated many contracts including a multi Bn€ EPC contract.

  • The Project delivered on cost and on a record 48 months time despite Arctic conditions.

  • At that time, the project was running to reach one the lowest cost per ton of LNG in the world.

  • We closed the largest ever External Project Finance.​

Other PROJECTS

Termokarstovoe.png
Termokarstovoe
Petro Cedeño-Sincor
Yurkharovskoye_edited.jpg
West Yurkharov
Dalia 30.04.2024.jpg
Dalia
Dalia .png
Pazflor
SnØhvit
2024-04-30 Tyrihans.png
Tyrihans
2024-04-30 Snorre field.png
Snorre B
1-carina.jpg
Carina - Aries
Capture d'écran 2024-05-01 111205.png
Tierra del Fuego
Capture d'écran 2024-05-01 112136.png
Alwyn North
Capture d'écran 2024-05-01 112807.png
Yadana
Vysotsk LNG.jpg
Vysotsk LNG
Kharyaga photo.jpg
Kharyaga
Termokarstovoe.png

Termokarstovoye
[Russia]

32 Bcm gas condensate field

  • M&A negotiation leader

  • Project Sponsor

  • Optimisation of development plan reducing well numbers by 2

  • Accelerated project start up up by one year

West Yurharov
[Russia]

900 bar, 5000m depth 120 Bn m3 tight gas field

  • Project Director

  • 1st Managed Pressure Drilling Development in Russia

  • 2 years year from concept to development launch

Yurkharovskoye_edited.jpg

Petro Cedeño / Sincor [Venezuela]

200 000 bopd Giant Onshore Extra Heavy Oil  field

  • Production and Subsurfqce Driector

  • Complete understanding of well potential

  • Complete understanding and control of water breakthrough

  • Defined, negotiated and executed the largest horizontal drilling campaign in Total with over 500 wells of 3000 m horizontal drains

Dalia
[Angola]

200 000 bopd Giant offshore heavy oil and gas Deepwater field 

  • Subsurface Director

  • Proposed and executed successful exploration plan 

  • Defined Optimum Development Plan including risk mitigation plan which allowed to take FID

  • Defined 1st Offshore Polymer Injection plan allowing to increase recovery by 10% 

Dalia 30.04.2024.jpg
Dalia .png

Pazflor 
[Angola]

200 000 bopd Giant offshore heavy oil and gas Deepwater field 

  • Subsurface Director

  • Successful exploration plan with 5 discoveries

  • 1st development designed with Subsea Separation

SnØhvit
[Norway]

130 Bcm Giant Offshore gas field

  • Technical Manager - non operator

  • Corrected reserve estimate of operator

  • Gave convincing arguments to Top Management allowing to negotiate enough tax incentive to take FID

2024-04-30 Tyrihans.png

Tyrihans
[Norway]

35 Bcm of Gas and  Offshore gas field

  • Technical Manager - non operator

  • Designed wells to enable producing enough reserves to reach enough profitability and take FID

Snorre B
[Norway]

180 000 bopd Giant Offshore field

  • Technical Manager - non operator

  • Manage to modify the drilling plan during start-up to triple production during the first year

2024-04-30 Snorre field.png
1-carina.jpg

Carina - Aries 
[Argentina]

Tierra Del Fuego
Canadon-Alfa Ara Argo 
[Argentina]

56 bcm gas condensate offshore field 

  • Subsurface Director

  • Successful exploration and appraisal plan

  • Resources evaluation demonstrating more complex reservoir dynamics allowing later development plan improvement and FID

Onshore and Offshore oil & gas fields complex

  • Subsurface Director- Head of Extended Reach Drilling (ERD) campaign

  • World longest ERD well (11184 m), still #3 today

  • Prepared a 5 stages priority development plan successfully implemented 

Capture d'écran 2024-05-01 111205.png
Capture d'écran 2024-05-01 112136.png

Alwyn North 
[UK]

200 million bo and 27 bcm offshore fields 

  • Reservoir Engineer

  • Improved production plan and condensate recovery

  • Resolved hydrate formation issues in offshore pipelines

  • Re-interpreted exploration results allowing to develop Triassic resources  

Yadana
[Burma]

150 Bcm Giant Offshore gas field

  • Reservoir Engineer

  • Exploration and appraisal wells

  • Demonstrated presence of high N2 content in reservoir allowing proper correction in negotiations and accurate resources assessment to plan for FID 

Capture d'écran 2024-05-01 112807.png
Vysotsk LNG.jpg

Vysotsk LNG
[Russia]

660 tpa LNG plant

  • Project Risks & Methods Lead

  • Set up of Project monitoring system

  • Managed the Risk and Opportunity register defining and supervising mitigation plans 

Kharyaga
[Russia]

Sour Oil field (H2S)

  • Project Control Engineer at Total E&P Russie

  • TotalEnergies was a part of the Kharyaga oil project for over 20 years, currently the project is operated by Zarubezhneft Production Kharyaga

Kharyaga photo.jpg