Grow Your Vision
At Concept stage
​​
-
Select optimum and “just what’s needed” optimum and greener concepts
-
Identify the best sites locations for the plant/project(s) and perform screening study to lead to the final selection.
-
Define a preliminary execution plan including Permitting, preliminary cost estimate and financing plan
-
Develop a risk and opportunity register that will constantly be updated for which mitigations will be monitored during the life span of the Project.
-
Define the scope of work for the Pre-Project study​



At Pre-Project stage
-
Determine the optimum technologies to use
-
Determine the optimum Engineering experts that could bid for the job
-
Perform the Call For Tender
-
Negotiate the contract to ensure maximum value and minimum cost to Company
-
Supervise the Pre-Project study
-
Complement the Contractor’s work with expert opinion and estimates based on real experiences
-
Develop a plan of study for all main disciplines and the test or survey programs necessary
-
Identify all main stakeholders at each institutional, governmental, technical, commercial and Financial level
-
Prepare securing the land for the facility
-
Prepare for the Permitting works
-
Define the most critical ESG and GHG parameters for which a reduction/mitigation plan shall be developed.
-
Improve the Project Execution Plan and identify the main critical path.
-
Develop a first draft mobilization plan
-
Prepare the Basic Engineering/FEED or DFS scope of work​