Highly skilled project director and project delivery expert with over 20 years of extensive project experience in LNG projects ranging from studies and conceptual designs to FEED and EPC to the design of LNG baseload plants and terminals.
Expert communicator and collaborator skilled at negotiating with key contractors and managing operations with a focus on design, process, safety, and compliance.
​
KEY ACHIEVEMENTS
Lead technical authority for a $25B LNG project in the Arctic, the most challenging LNG project ever attempted.
Main contract negotiator for the FEED and EPC phases with prime Novatek contractors, including Linde (liquefaction licensor) and BASF (acid gas removal licensor) that ensured successful completion of project and secured a 25% reduction in BASF license fees.
​
AREAS OF EXPERTISE
Lithium Battery Refining | Project Delivery | Project Management | LNG Specialist | Technical Authority | Claims Defence | Contractor Management | Dispute Resolution | Team & Personnel Management | Gas Processing | Process Design & Review | Standards & Compliance | FEED | Contract Negotiation | Process Safety | Technical Assurance | Budgets | Design Reviews
​
​
Work Experience
June 2022 - current
May 2019 - December 2021
June 2017 - May 2019
Sept 2016 - June 2017
July 2013 - May 2016
Livista Energy | Paris, France
PROJECT DIRECTOR – Astari Lithium Refinery Project
-
Prepared the plan to deliver the Astari lithium refinery project from initial concept. Managed the pre-feasibility study, reviewed potential site locations, FEED contract tender, contractual documentation preparation, launched permitting programme, laboratory testing plan.
-
Mobilisation plan preparation for project management and execution team.
-
Participation in investor meetings supported by Morgan Stanley.
​
Novatek | Moscow, Russia & Paris, France
ENGINEERING MANAGER – Arctic LNG2 EPC
-
Managed 30 discipline engineers in Paris and Krasnodar execution centres as technical authority for Arctic LNG2 project; collaborated with senior management on timelines, reports and costs; ensured adherence to key project safety requirements.
-
Protected Arctic LNG2 interests and fulfilled requirements of design dossier, scope of work, and other contract specifications
-
Performed detailed analysis of man-hours and costs against budgets for claims of changes in scope and supported analysis through technical notes and justifications to management
-
Acted as final approval authority for deviations to project specifications
-
Directed the execution of technical project decisions; made key engineering and technical decisions
-
Matched forecast workload against resources; made appropriate team adjustments and advanced experienced engineers to new project phases.
Arctic LNG2 FEED | Paris, France
ENGINEERING MANAGER
-
Led team of 25 discipline engineers in three execution centres (Moscow, Paris, and Munich) responsible for the common onshore facilities and the topsides modules on three gravity-based structures with production capacity of 6.6 MTPA of LNG.
-
Directed delivery of full design dossier and guaranteed attainment of key project drivers, including low CAPEX, safety, high availability, and plant longevity.
-
Conducted technical negotiations for the equipment supply agreement for Linde liquefaction licensor and technical and commercial negotiations with BASF for the acid gas removal unit license.
-
Increased plant capacity from 6.2 to 6.6 MTPA through implementation of selected technology improvements.
-
Led the EPC phase contract negotiations with Technip and Nipigas for the technical exhibits of the execution phase of the project, including scope of work, performance guarantees, and design dossier.
Novatek | Moscow, Novatek LNG Department
LNG TECHNOLOGIES LEADER
-
Managed the Arctic LNG2 project to prepare for the FEED phase by performing cold-eyes review of work and developing a plan of future studies to optimize the design and increase production capacity.
-
Collaborated with operations personnel at the Novatek Yamal facility in Sabetta implement their lessons learned.
-
Led contract negotiations for the technical exhibits to the FEED contract and the liquefaction licensor design package.
-
Developed organization chart for the engineering team executing the FEED phase; conducted interviews and on-boarded new-hires.
BG Group | Reading, United Kingdom
PROCESS TECHNICAL MANAGER – BG Advance Capital Projects Engineering Team.
-
Provided functional leadership, guidance, and expertise as the lead for Process Safety in Design (PSID) for BG, including applying standards, setting PSID study requirements, overseeing third-party verification studies, and engaging with operating assets and senior management.
-
Led the review and update of BG standards.
-
Guided project operations for Brazil, Australia, Bolivia, and India asset locations, including implementation and compliance with BG and industry standards, identification and approval of mitigations.
-
Served as key process representative for the Lake Charles LNG and Dragon LNG re-liquefaction projects.​​

Additional Experience
Total Exploration & Production | London, United Kingdom
2011 – 2013
Senior Process Engineer – Yamal LNG FEED
CB&I | London, United Kingdom
2011
Principal Process Engineer – Yamal LNG FEED
​
BG Group | Milan, Italy
2010 – 2011
Process Manager – Brindisi LNG Terminal FEED
​
Foster Wheeler Energy LTD | Reading, United Kingdom
2009 – 2010
Principal Process Engineer – Statoil Snohvit Train 2 Study (December 2009 – May 2010)
Principal Process Engineer – Ras Tanura Integrated Project (July 2009 – December 2009)
Principal Process Engineer – ETi Next Generation CO2 Capture Technologies (April 2009 – July 2009)
​
MW Kellogg LTD | London, United Kingdom
2008 – 2009
Principal Process Engineer – Gorgon Project, Barrow Island LNG (April 2008 – April 2009)
Principal Process Engineer – Statoil Hydro Snohvit 2 Energy Study (January 2008 – April 2008)
​
Foster Wheeler Energy LTD | Reading, United Kingdom
2004 – 2008
LNG Consultant – Pluto LNG Project (November 2007 – January 2008)
LNG Consultant – Browse LNG Project (February 2007 – November 2007)
LNG Consultant – Sasol LNG vs GTL Study (January 2007 – March 2007)
LNG Consultant – Nigeria LNG Train SevenPlus Project (September 2016 – June 2017)
Study Manager – Petrobras, GTL-FPSO Feasibility Study (November 2005 – February 2006)
Senior Process Engineer – Woodside Energy LTD, Pluto LNG Project (August 2005 – November 2005)
Senior Process Engineer – SAMREF LSADO & 2006 Projects (August 2004 – August 2005)
​
MW Kellogg LTD | London, United Kingdom 2001 – 2004
Process Lead Engineer – Statoil Mongstad, Combine Heat, Power Plant (October 2003 – August 2004)
Senior Process Engineer – Egypt LNG Project (August 2003 – October 2003)
Senior Process Engineer – Nigeria LNG Project, Train 6 (April 2003 – August 2003)
Senior Process Engineer – Nigeria LNG Project, Trains 4 & 5 (April 2001 – April 2003)
Education
University of Leeds | Leeds, United Kingdom
Bachelor of Engineering, Chemical Engineering (Honours)
​
University of Hull | Hull, United Kingdom
Bachelor of Science, Chemistry