​Driven and analytical, Project & Construction Management professional with over 23 years of global experience, delivering Greenfield and Brownfield projects $1B+ within the energy sector. Highly adept at executing projects to superlative standards from concept planning through to completion (pre-FEED to EPC).

 

Skilled at cultivating collaborative environments with key stakeholders, clients, and personnel, motivating multidisciplinary project teams to achieve continuous project improvement. Outstanding organisational and coordination skills with proven capacity to deliver and execute projects. Knowledge of environmental, social, governance (ESG) and sustainability, transformation to Net Zero emissions.  

Work Experience

2023  - current

2022 - 2023

2021 - 2022

2017 - 2021

2013 - 2017

2012 - 2013

2009 - 2012

2007 - 2009

ALFANAR ENERGY LTD | UK, London, Teesside

PROJECT MANAGER / CONSTRUCTION MANAGER 

Project: Lighthouse Green Fuel (LGF), Teesside, (Front-End Engineering Design FEED) {Est. TIC $2.0 Billion}

  • Developing project execution strategy and ensuring alignment with licensors technology providers.

  • Project managing disconnection & demolition scope of work package, from RFP to awarding contracts.

  • Leading FEED Contractor (Worley) to deliver construction related documentation, including modularisation, Advanced Work Packaging (AWP), HSE aspect, constructability & logistics aspects of the project, including plot plan review. 

  • Supporting Development Consent Order (DCO) requirements, engaging & negotiating with communities & landowners.

KBR | UK, London | Saudi Arabia | Netherlands | Australia                     SENIOR PROJECT MANAGER – Construction, KBR​

 

Projects:

1) Fadhil Gas Expansion (GIP), Saudi Aramco (Front-End Engineering Design FEED) {Est. TIC $7.2 Billion}

2) Base Load Power Hub (BLPH), SHELL (Concept study) - offshore HKN wind farm

3) Gladstone MCH, ENEOS / ORIGIN (Concept study) – Green Hydrogen

  • Developed EPC contracting strategy, ensuring adequate split of scope and minimum interface with brownfield works.

  • Appointed as Aramco’s constructability facilitator on the project and delivered key aspects of construction.

  • Embraced modularisation extent through modular design assessment (MDA) for the project.  

 

Other Projects:

  • Conducted logistics study for BLPH green hydrogen produced by water electrolysis and electricity stored in Battery Energy Storage System (BESS).

  • Conducted constructability studies for Gladstone MCH Green Hydrogen (H2 production 40,000t/yr) project in Australia.

​WORLEY | UK, London

​SENIOR MANAGER – Construction, Worley

​

Project: Humber Zero, VPII & Phillips 66, Immingham, (Front-End Engineering Design FEED) {Est. TIC $1.2 Billion}

  • Develop infrastructure facilities, modification to data centre (CCR), modularisation & contracting strategy, carry out constructability to optimise the project execution.  

  • Prepared temporary construction facilities (TCF), Advanced Work Packaging (AWP), to include CWA followed by CWP and EWP for the project and ensuring execution schedule has logic for ‘beginning with the end in mind’. 

 

SENIOR MANAGER – Construction, Worley                                              

Project: SHAHEEN, S-OIL, South Korea (Front-End Engineering Design FEED) {TIC $7 Billion}

  • Successfully developed modularisation & contracting strategy for modules; and conducted constructability to optimise the project execution with Advanced Work Packaging (AWP). Proactively project managed critical technical issues.

  • Develop ITB strategy, scope and clarification to bidders, along with EPC milestone schedule and estimated TIC cost.

​

NOVATEK ALNG2, ALNG2 | Paris, Moscow

PROJECT CONSTRUCTION MANAGER - Module & Interface

INTEGRATION MANAGER (2019 – 2021) {Est. TIC $21 Billion}

Project: Arctic LNG 2 (ALNG2/Novatek), Paris, Moscow (FEED & EPC)

Promoted through roles of increasing scope and accountability to PROJECT MANAGER - MODULE & INTERFACE MANAGER

  • Successfully saved CAPEX $100M by means of optimised solutions, i.e., GBS location and thermal insulation.

  • Commended for challenging EPC contractor (Technip) design and achieving optimisation on ALP platforms piperack, saving 1K+ tonnes of material and 20k site person-hours.

  • Optimised key interface sequence activity / constructability on GBS arrival and hook-up to onshore facility in support of first start-up operation, reducing start-up schedule by 2 weeks (potential LNG revenue gain of $70M).

  • Successfully developed Modularisation and Topside (TS) fabrication strategy for 14 modules of total weight circa 162,500T, on GBS with modules weighing from 7K tonnes up to 15.5K tonnes, including data centre (CCR).

KBR (SHELL/STATOIL) | UK, London | Norway

PROGRAM STUDY MANAGER – KBR

Project: Shell IPT Client – Shell / Statoil​

  • Successfully diminished costs 3% TIC for LNG construction (site & camp) and project engineering.

  • Effectively optimised constructability study and Gas-to-Liquid (GTL) layout, resulting in 2% reduction in TIC.

​

CONSTRUCTION MANAGER – KBR  Canada | Russia | Azerbaijan   

Project: Repsol /Gazprom Neft /SOCAR (PMC & Pre-FEED)

  • As Construction Manager (Pre-FEED) for Saint John LNG  terminal in New Brunswick, Canada for Repsol, developed feasibility study and established modularisation strategy to attain optimum constructability with input to EPC cost estimate. Appointed as Construction Manager (PMC) for SOCAR OGPC FEED project in Baku Azerbaijan, and managed review/critique of construction deliverables from FEED Contractor. Validated Class-II estimate in line with protocols.

CONSTRUCTION MANAGER – KBR | UK, London      

Project: Proposals (Various Clients)

  • Aided over 20 onshore proposals bids to value of $2B for refinery, LNG, and GTL. Offered support to proposals and marketing for over five proposals estimated at $1B for FPSO, jackets, FLNG, and topside; won three proposals. Brainstormed and implemented construction strategy for Gorgon expansion project (GEP).

​​

BECHTEL | UK, London | Egypt

SENIOR CONSTRUCTION LEAD 

Project: BPWND – West Nile Delta (EPC), Client – BP {TIC $9 Billion}

  • ​Determined and developed scope of work prior to conducting technical evaluations. Ideated and delivered construction execution strategy and conducted constructability review in collaboration with project engineering.

  • Offered input on level 2/3 schedule and provided project EPC cost estimate.

  • Championed contract negotiation on site and coordinated tasks with subcontractor in early construction phase.

  • Promoted health & safety behavioral culture on site. 

  • Budget management. 

​​

MW KELLOGG (KBR) | Australia, Barrow Island

ASSISTANT TECHNICAL SERVICE MANAGER

Project: Gorgon LNG, MWKL (FEED and EPCm), Client – Chevron (CVX) {TIC $54 Billion}

  • Project execution of multibillion dollar LNG project in Australia. Managed construction team consisting of 3 superintendents, 9 supervisors, and 3 execution contractors for temporary facilities, civil, and site preparation. Identified key opportunities to reduce 40K onsite person-hours by maximising preassembly scope.

  • Advanced fabrication/modularisation strategy and executed technical reviews estimated at $4B. Ensured day-to-day technical challenges such as RFI/TQ were resolved in timely manner, and regularly conducted on-site constructability.

  • Management of advance work packaging (AWP), through path of construction (CWP & IWP). Acted as Site Manager for site drainage $20M, delivered within budget and on schedule.​​

MW Kellogg (KBR/JGC) | UK, London | Norway 

PRINCIPAL CONSTRUCTION ENGINEER  

Project: KEP2010 MWKL (EPCa), Client – Statoil {TIC NOK 6.5 Billion}​

  • Appointed as Construction Lead to develop construction documents, spearhead numerous constructability reviews, and oversee logistics-in reviews for three brownfield projects, including shutdown scope of work, transportation, and installation strategy. 

  • Coordination between various operating centers.

Additional Experience

 2006 - 2007

2002 - 2006

2001 - 2002

SENIOR CONSTRUCTION ENGINEER, M.W Kellogg (KBR/JGC), UK, London | Qatar                

  • Project: Pearl Gas-to-Liquid (GTL), Qatar, Client – Shell / Qatar Petroleum 

FIELD CONSTRUCTION ENGINEER, M.W Kellogg (KBR/JGC), Nigeria, Bonny Island  

  • Project: NLNG-4/5 & NLNG-6, Bonny Island, Client – Nigeria LNG (NLNG) 

PROPOSAL COORDINATOR, M.W Kellogg (KBR/JGC),

UK, London

Education 

2021

2014

2010

2001

2000

University of Cambridge | UK (Appointed Assessor - 2022)

Business & Climate Change: Towards Net Zero Emissions

Cranfield School of Management | UK

Improving Project Performance

Manchester Business School UK

MBA Construction Executive

University of Strathclyde UK

MSc Construction Management

CEPT University India

Bachelor's in Construction Technology Building Science & Technology

Let's Get
Social

  • Linkedin
bottom of page